Residences

0

Hybrid panels

0

Years amortization

0KgCO2

/year of emissions avoided

Datasheet

Sector Residence
Location Torrejón de Ardoz, Madrid
Usage DHW
Number of panels 78
Payback 6 years
Total savings of emissions 37.242 kgCO2/year
Electrical production 27.331 kWh/year
Thermal production 103.213 kWh/year
Year of installation 2019