Vitalia Residence – Zaragoza (Spain)

abora solar installation

Nursing home
Zaragoza (Spain)
2019
64 Panels
Number of solar panels
64
Use
DHW + Electricity
Electrical production
22394 kWh/year
Thermal production
83540 kWh/year
Auxiliary system
Biomass boiler
Total emissions savings
33920 KgCO2
Installer
Ecoclima
Engineering
-
-- %
of energy savings
-- %
of CO2 emissions reduction

They already trust us

Similar installations

Showing: 15 installations
Clear filter
Nursing Home – Kungsbacka (Sweden)
Nursing home
Kungsbacka, Suecia
2021
Installer
-
Engineering
-
126
panels
56
kgCO2/year avoided
Installation in a Hospital – Santiago (Chile)
Hospital
Santiago, Chile
2024
Installer
Uria
Engineering
Uria
117
panels
79.499
kgCO2/year avoided
Installation in Residence El Castillo – Asturias (Spain)
Nursing home
Asturias
2024
Installer
Inersa
Engineering
Ecubo
15
panels
6.951
kgCO2/year avoided
Torre Monreal Residence – Tudela (Spain)
Nursing home
Tudela (Spain)
2022
Installer
Gamio Denalan Obras y Servicios SL.
Engineering
-
100
panels
67.145
kgCO2/year avoided
Residence – Rosales del Canal (Spain)
Nursing home
Rosales del Canal (Spain)
2019
Installer
Tecmosa
Engineering
-
63
panels
44.716
kgCO2/year avoided
Campotejar Residence – Granada (Spain)
Nursing home
Granada (Spain)
2019
Installer
Ingener del Sur S.L.
Engineering
-
51
panels
27.030
kgCO2/year avoided
Casetas Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ambitec S.A.U.
Engineering
-
50
panels
35.071
kgCO2/year avoided
Vitalia Residence – Madrid (Spain)
Nursing home
Madrid (Spain)
2019
Installer
-
Engineering
-
23
panels
17.922
kgCO2/year avoided
Vitalia Residence – Málaga (Spain)
Nursing home
Málaga (Spain)
2018
Installer
-
Engineering
-
64
panels
33.920
kgCO2/year avoided
Vitalia Residence – Toledo (Spain)
Nursing home
Toledo (Spain)
2018
Installer
FLUHIDRA INSTALACIONES
Engineering
-
64
panels
33.920
kgCO2/year avoided
Vitalia Residence – Torrejón de Ardoz (Spain)
Nursing home
Torrejón de Ardoz (Spain)
2019
Installer
Grupo Intra s.a
Engineering
-
78
panels
37.242
kgCO2/year avoided
Solera Asistencial Residence – Pamplona (Spain)
Nursing home
Pamplona (Spain)
2022
Installer
GAMIO DENALAN OBRAS Y SERVICIOS SL.
Engineering
-
136
panels
92.365
kgCO2/year avoided
CIBA Biomedical Research Center of Aragón – Zaragoza (Spain)
Hospital
Zaragoza (Spain)
2023
Installer
Grupo Cobra
Engineering
-
58
panels
83.020
kgCO2/year avoided
Maz – Zaragoza (Spain)
Hospital
Zaragoza (Spain)
2023
Installer
Veolia
Engineering
-
90
panels
66.684
kgCO2/year avoided

Don’t loose your time and your money, bet on us!