University of Philosophy – Zaragoza (Spain)
abora solar installation
Public center
Zaragoza, España
2024
112 Panels
Number of solar panels
112
Use
ACS + Electricity + Heating + Pool
Thermal production
153,170 kWh/year
Electrical production
60,235 kWh/year
Auxiliary system
-
Total emissions savings
75,318 KgCO2
Installer
Eiffage
Engineering
Ingeniería Torne
of energy savings
of CO2 emissions reduction
Similar installations
Showing: 12 installations
Clear filter
Vega de Arriba Pool – Mieres (Spain)
Sport Center
Mieres, Asturias
2023
Installer
Elecnor
Engineering
Uria
60
panels
panels
-
kgCO2/year avoided
kgCO2/year avoided
Installation in Sports Center San Ignacio – Bilbao (Spain)
Sport Center
Bilbao
2024
Installer
Veolia
Engineering
CEI Asociados
128
panels
panels
81.585
kgCO2/year avoided
kgCO2/year avoided
OECD Building – Paris (France)
Public center
Paris (France)
2021
Installer
Climasphere
Engineering
-
140
panels
panels
52.955
kgCO2/year avoided
kgCO2/year avoided
Atades Center – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2020
Installer
Incliza
Engineering
-
40
panels
panels
29.556
kgCO2/year avoided
kgCO2/year avoided
British School – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2019
Installer
-
Engineering
-
90
panels
panels
42.847
kgCO2/year avoided
kgCO2/year avoided
Police Station – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2021
Installer
IMESA
Engineering
-
26
panels
panels
9.760
kgCO2/year avoided
kgCO2/year avoided
Sports Center – San Cugat del Vallés (Spain)
Sport Center
San Cugat del Vallés (Spain)
2018
Installer
Tevigrup
Engineering
-
160
panels
panels
84.800
kgCO2/year avoided
kgCO2/year avoided
Swimming Club – Barcelona (Spain)
Sport Center
Barcelona (Spain)
2023
Installer
Grupo Construcía
Engineering
Grupo Construcía
1041
panels
panels
774.809
kgCO2/year avoided
kgCO2/year avoided
El Fango Sports Center – Bilbao (Spain)
Sport Center
Bilbao (Spain)
2023
Installer
Elecnor
Engineering
-
72
panels
panels
53.640
kgCO2/year avoided
kgCO2/year avoided
Sports Center – Tauste (Spain)
Sport Center
Tauste (Spain)
2022
Installer
Grupo EWD
Engineering
-
204
panels
panels
41.541
kgCO2/year avoided
kgCO2/year avoided