Torre Monreal Residence – Tudela (Spain)
abora solar installation
Nursing home
Tudela (Spain)
2022
100 Panels
Number of solar panels
100
Use
DHW
Electrical production
39990
Thermal production
152705
Auxiliary system
Gas boiler
Total emissions savings
67145
Installer
Gamio Denalan Obras y Servicios SL.
Engineering
-
of energy savings
of CO2 emissions reduction
Similar installations
Showing: 12 installations
Clear filter
Campotejar Residence – Granada (Spain)
Nursing home
Granada (Spain)
2019
Installer
Ingener del Sur S.L.
Engineering
-
51
panels
panels
27.030
kgCO2/year avoided
kgCO2/year avoided
Casetas Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ambitec S.A.U.
Engineering
-
50
panels
panels
35.071
kgCO2/year avoided
kgCO2/year avoided
Vitalia Residence – Madrid (Spain)
Nursing home
Madrid (Spain)
2019
Installer
-
Engineering
-
23
panels
panels
17.922
kgCO2/year avoided
kgCO2/year avoided
Vitalia Residence – Málaga (Spain)
Nursing home
Málaga (Spain)
2018
Installer
-
Engineering
-
64
panels
panels
33.920
kgCO2/year avoided
kgCO2/year avoided
Vitalia Residence – Toledo (Spain)
Nursing home
Toledo (Spain)
2018
Installer
FLUHIDRA INSTALACIONES
Engineering
-
64
panels
panels
33.920
kgCO2/year avoided
kgCO2/year avoided
Vitalia Residence – Torrejón de Ardoz (Spain)
Nursing home
Torrejón de Ardoz (Spain)
2019
Installer
Grupo Intra s.a
Engineering
-
78
panels
panels
37.242
kgCO2/year avoided
kgCO2/year avoided
Vitalia Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ecoclima
Engineering
-
64
panels
panels
33.920
kgCO2/year avoided
kgCO2/year avoided
Residence – Rosales del Canal (Spain)
Nursing home
Rosales del Canal (Spain)
2019
Installer
Tecmosa
Engineering
-
63
panels
panels
44.716
kgCO2/year avoided
kgCO2/year avoided
Solera Asistencial Residence – Pamplona (Spain)
Nursing home
Pamplona (Spain)
2022
Installer
GAMIO DENALAN OBRAS Y SERVICIOS SL.
Engineering
-
136
panels
panels
92.365
kgCO2/year avoided
kgCO2/year avoided
CIBA Biomedical Research Center of Aragón – Zaragoza (Spain)
Hospital
Zaragoza (Spain)
2023
Installer
Grupo Cobra
Engineering
-
58
panels
panels
83.020
kgCO2/year avoided
kgCO2/year avoided