Swimming Club – Barcelona (Spain)
abora solar installation
Sport Center
Barcelona (Spain)
2023
1041 Panels
Number of solar panels
1041
Use
DHW + Pool
Thermal production
1,641,095 kWh/year
Electrical production
543,438 kWh/year
Auxiliary system
Gas boiler
Total emissions savings
774,809 KgCO2
Installer
Grupo Construcía
Engineering
Grupo Construcía
of energy savings
of CO2 emissions reduction
Testimonio

The Barcelona Swimming Club has finally been able to inaugurate its solar panel park. This hybrid park makes us an incredibly sustainable entity, allowing us to generate the energy we need not only to heat our pools but also for the rest of our facilities.
Bernat Antrás
President of the Barcelona Swimming Club
Similar installations
Showing: 12 installations
Clear filter
University of Philosophy – Zaragoza (Spain)
Public center
Zaragoza, España
2024
Installer
Eiffage
Engineering
Ingeniería Torne
112
panels
panels
75.318
kgCO2/year avoided
kgCO2/year avoided
Vega de Arriba Pool – Mieres (Spain)
Sport Center
Mieres, Asturias
2023
Installer
Elecnor
Engineering
Uria
60
panels
panels
-
kgCO2/year avoided
kgCO2/year avoided
Installation in Sports Center San Ignacio – Bilbao (Spain)
Sport Center
Bilbao
2024
Installer
Veolia
Engineering
CEI Asociados
128
panels
panels
81.585
kgCO2/year avoided
kgCO2/year avoided
OECD Building – Paris (France)
Public center
Paris (France)
2021
Installer
Climasphere
Engineering
-
140
panels
panels
52.955
kgCO2/year avoided
kgCO2/year avoided
Atades Center – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2020
Installer
Incliza
Engineering
-
40
panels
panels
29.556
kgCO2/year avoided
kgCO2/year avoided
British School – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2019
Installer
-
Engineering
-
90
panels
panels
42.847
kgCO2/year avoided
kgCO2/year avoided
Police Station – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2021
Installer
IMESA
Engineering
-
26
panels
panels
9.760
kgCO2/year avoided
kgCO2/year avoided
Sports Center – San Cugat del Vallés (Spain)
Sport Center
San Cugat del Vallés (Spain)
2018
Installer
Tevigrup
Engineering
-
160
panels
panels
84.800
kgCO2/year avoided
kgCO2/year avoided
El Fango Sports Center – Bilbao (Spain)
Sport Center
Bilbao (Spain)
2023
Installer
Elecnor
Engineering
-
72
panels
panels
53.640
kgCO2/year avoided
kgCO2/year avoided
Sports Center – Tauste (Spain)
Sport Center
Tauste (Spain)
2022
Installer
Grupo EWD
Engineering
-
204
panels
panels
41.541
kgCO2/year avoided
kgCO2/year avoided