Sports Center – Tauste (Spain)

abora solar installation

Sport Center
Tauste (Spain)
2022
204 Panels
Number of solar panels
204
Use
DHW + Pool
Electrical production
91483
Thermal production
236172
Auxiliary system
Biomass boiler
Total emissions savings
41541
Installer
Grupo EWD
Engineering
-
26 %
of energy savings
-- %
of CO2 emissions reduction

Similar installations

Showing: 24 installations
Clear filter
Museo de Barro Winery – La Bañeza (Spain)
Hotel
La Bañeza (Spain)
2018
Installer
Green's Projects
Engineering
-
4
panels
2.682
kgCO2/year avoided
Hotel Iberostar – Tenerife (Spain)
Hotel
Tenerife (Spain)
2019
Installer
Grupo DAC
Engineering
-
102
panels
86.544
kgCO2/year avoided
Hotel Iberostar Royal Andalus – Chiclana de la Frontera (Spain)
Hotel
Chiclana de la Frontera (Spain)
2020
Installer
Arki
Engineering
-
300
panels
204.785
kgCO2/year avoided
Hotel Loar – Menorca (Spain)
Hotel
Menorca (Spain)
2019
Installer
Barbercoll
Engineering
-
134
panels
121.641
kgCO2/year avoided
Hotel Resort – Gerona (Spain)
Hotel
Gerona (Spain)
2018
Installer
KPL Solar
Engineering
-
50
panels
30.578
kgCO2/year avoided
Hotel Sancho Abarca – Huesca (Spain)
Hotel
Huesca (Spain)
2019
Installer
Levitec
Engineering
-
18
panels
13.294
kgCO2/year avoided
Hotel – South Africa
Hotel
South Africa
2021
Installer
Solarus
Engineering
-
20
panels
20.418
kgCO2/year avoided
Hotel Hacienda Na Xamena – Ibiza (Spain)
Hotel
Ibiza (Spain)
2023
Installer
-
Engineering
Ingeniería MASRED
63
panels
61.070
kgCO2/year avoided
Hotel Iberostar Albufera Park – Mallorca (Spain)
Hotel
Mallorca (Spain)
2023
Installer
Estel Ingeniería
Engineering
Estel Ingeniería
180
panels
174.693
kgCO2/year avoided
Hotel Iberostar Jardín del Sol – Mallorca (Spain)
Hotel
Mallorca (Spain)
2022
Installer
-
Engineering
-
162
panels
170.325
kgCO2/year avoided
Hotel Iberostar Las Dalias – Tenerife (Spain)
Hotel
Tenerife (Spain)
2021
Installer
Grupo DAC
Engineering
-
240
panels
256.542
kgCO2/year avoided
Hotel Lago – Menorca (Spain)
Hotel
Menorca (Spain)
2021
Installer
-
Engineering
Cofrica
134
panels
142.304
kgCO2/year avoided
Hotel Pacoche – Murcia (Spain)
Hotel
Murcia (Spain)
2023
Installer
FAJARDO ENERGÍAS
Engineering
-
30
panels
26.968
kgCO2/year avoided
Hotel Santos Las Arenas – Valencia (Spain)
Hotel
Valencia (Spain)
2023
Installer
Instalaciones Fonsa
Engineering
-
122
panels
98.551
kgCO2/year avoided
Hotel Santos Nelva – Murcia (Spain)
Hotel
Murcia (Spain)
2023
Installer
Grupo Pastor
Engineering
-
98
panels
84.290
kgCO2/year avoided
Hotel Villa Maria – Santa Barbara de Nexe (Portugal)
Hotel
Santa Barbara de Nexe (Portugal)
2020
Installer
Filotipo
Engineering
-
4
panels
5.599
kgCO2/year avoided
Hotel – Boltaña (Spain)
Hotel
Boltaña (Spain)
2021
Installer
-
Engineering
-
34
panels
16.601
kgCO2/year avoided
Hotel – The Hague (Netherlands)
Hotel
The Hague (Netherlands)
2021
Installer
Solarus
Engineering
-
12
panels
5.693
kgCO2/year avoided
Hotel – Poço e Meio (Portugal)
Hotel
Poço e Meio (Portugal)
2020
Installer
Filotipo
Engineering
-
6
panels
7.067
kgCO2/year avoided
Sports Center – San Cugat del Vallés (Spain)
Sport Center
San Cugat del Vallés (Spain)
2018
Installer
Tevigrup
Engineering
-
160
panels
84.800
kgCO2/year avoided
Swimming Club – Barcelona (Spain)
Sport Center
Barcelona (Spain)
2023
Installer
Grupo Construcía
Engineering
Grupo Construcía
1041
panels
774.809
kgCO2/year avoided
El Fango Sports Center – Bilbao (Spain)
Sport Center
Bilbao (Spain)
2023
Installer
Elecnor
Engineering
-
72
panels
53.640
kgCO2/year avoided
Teresa Perales Sports Center – Cuarte de Huerva (Zaragoza)
Sport Center
Cuarte de Huerva (Zaragoza)
2023
Installer
Grupo Cobra
Engineering
Rubén Mungía
48
panels
-
kgCO2/year avoided

Don’t loose your time and your money, bet on us!