Puente Genil Sports Centre – Cordoba (Spain)

abora solar installation

Sport Center
Cordoba
2025
71 Panels
Number of solar panels
71
Use
ACS + Swimming pool + Electricity
Thermal production
103,382 kWh/year
Electrical production
44,128 kWh/year
Auxiliary system
Biomass boiler
Total emissions savings
96,045 KgCO2
Installer
Naturclima
Engineering
Lomoa Ingenieria
80 %
of energy savings
81 %
of CO2 emissions reduction

They already trust us

Similar installations

Showing: 14 installations
Clear filter
Mid-Kent College – London (United Kingdom)
Public center
London
2025
Installer
-
Engineering
-
600
panels
89.710
kgCO2/year avoided
University of Philosophy – Zaragoza (Spain)
Public center
Zaragoza, España
2024
Installer
Eiffage
Engineering
Ingeniería Torne
112
panels
75.318
kgCO2/year avoided
Vega de Arriba Pool – Mieres (Spain)
Sport Center
Mieres, Asturias
2023
Installer
Elecnor
Engineering
Uria
60
panels
-
kgCO2/year avoided
Installation in Sports Center San Ignacio – Bilbao (Spain)
Sport Center
Bilbao
2024
Installer
Veolia
Engineering
CEI Asociados
128
panels
81.585
kgCO2/year avoided
OECD Building – Paris (France)
Public center
Paris (France)
2021
Installer
Climasphere
Engineering
-
140
panels
52.955
kgCO2/year avoided
Atades Center – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2020
Installer
Incliza
Engineering
-
40
panels
29.556
kgCO2/year avoided
British School – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2019
Installer
-
Engineering
-
90
panels
42.847
kgCO2/year avoided
Police Station – Zaragoza (Spain)
Public center
Zaragoza (Spain)
2021
Installer
IMESA
Engineering
-
26
panels
9.760
kgCO2/year avoided
Sports Center – San Cugat del Vallés (Spain)
Sport Center
San Cugat del Vallés (Spain)
2018
Installer
Tevigrup
Engineering
-
160
panels
84.800
kgCO2/year avoided
Swimming Club – Barcelona (Spain)
Sport Center
Barcelona (Spain)
2023
Installer
Grupo Construcía
Engineering
Grupo Construcía
1041
panels
774.809
kgCO2/year avoided
El Fango Sports Center – Bilbao (Spain)
Sport Center
Bilbao (Spain)
2023
Installer
Elecnor
Engineering
-
72
panels
53.640
kgCO2/year avoided
Sports Center – Tauste (Spain)
Sport Center
Tauste (Spain)
2022
Installer
Grupo EWD
Engineering
-
204
panels
41.541
kgCO2/year avoided
Teresa Perales Sports Center – Cuarte de Huerva (Zaragoza)
Sport Center
Cuarte de Huerva (Zaragoza)
2023
Installer
Grupo Cobra
Engineering
Rubén Mungía
48
panels
-
kgCO2/year avoided

Don’t loose your time and your money, bet on us!