Multi-dwelling Oviedo
abora solar installation
Multi-housing
Oviedo, Asturias
2024
5 Panels
Number of solar panels
5
Use
DHW + Electricity
Thermal production
8,000 kWh/year
Electrical production
2,500 kWh/year
Auxiliary system
Gas boiler
Total emissions savings
3,500 KgCO2
Installer
Inersa
Engineering
Ecubo
of energy savings
of CO2 emissions reduction
Objectives
- Transformación de la sala de carbón a gas natural
- Bonificación IBI por 3 años
- Genera CAEs
Similar installations
Showing: 39 installations
Clear filter
District Heating- Corsica (France)
Urban network
Corsica
2023
Installer
-
Engineering
-
230
panels
panels
55.662
kgCO2/year avoided
kgCO2/year avoided
District heating – Abensberg (Germany)
Urban network
Abensberg
2025
Installer
Varmeco
Engineering
Varmeco
118
panels
panels
66.472
kgCO2/year avoided
kgCO2/year avoided
Multidwelling Adlerweg – Chur (Switzerland)
Multi-housing
Chur
2024
Installer
Sky Technik
Engineering
Sky Technik
54
panels
panels
35.445
kgCO2/year avoided
kgCO2/year avoided
Multidwelling Scalettastr – Chur (Switzerland)
Multi-housing
Chur
2025
Installer
Sky Technik
Engineering
Sky Technik
53
panels
panels
34.788
kgCO2/year avoided
kgCO2/year avoided
Installation in a single-family home – Hamburg (Germany)
Single-family-home
Hamburg
2025
Installer
ATEC
Engineering
ATEC
4
panels
panels
595
kgCO2/year avoided
kgCO2/year avoided
Civil Guard Headquarters – Jaca (Spain)
Single-family-home
Jaca (Huesca)
2025
Installer
-
Engineering
-
90
panels
panels
72.307
kgCO2/year avoided
kgCO2/year avoided
Single-family homes – Chur (Switzerland)
Single-family-home
Chur, Suiza
2024
Installer
Sky Technik
Engineering
Sky Technik
13
panels
panels
3
kgCO2/year avoided
kgCO2/year avoided
District Network Poland
Urban network
Poland
2023
Installer
-
Engineering
-
60
panels
panels
36.497
kgCO2/year avoided
kgCO2/year avoided
District Network Cuenca
Urban network
Cuenca
2024
Installer
REBI
Engineering
REBI
1090
panels
panels
304.301
kgCO2/year avoided
kgCO2/year avoided
District Network Olvega Soria
Urban network
Soria
2023
Installer
REBI
Engineering
REBI
552
panels
panels
124.337
kgCO2/year avoided
kgCO2/year avoided