Maz – Zaragoza (Spain)
abora solar installation
Hospital
Zaragoza (Spain)
2023
90 Panels
Number of solar panels
90
Use
DHW
Thermal production
137,320 kWh/year
Electrical production
51,881 kWh/year
Auxiliary system
Gas boiler
Total emissions savings
66,684 KgCO2
Installer
Veolia
Engineering
-
of energy savings
of CO2 emissions reduction
Testimonio

We will be able to recude approximately 78 or 80 tons a year, which is equivalent to planting a year, about 2000 trees, more or less and we have done that in MAZ, within our idea of contributing our bit to sustainability, in our hospital in Zaragoza, which is the largest workplace of the 80 that we have in all Spain, and also with the help of an Aragonese company that is Abora Solar, to which we are grateful because we have made a very fast plate start-up, panels with technology much more efficient than photovoltaics of a life
Guillermo de Vílchez
Manager of MAZ
Similar installations
Showing: 17 installations
Clear filter
Hospital – Teruel (Spain)
Hospital
Teruel, España
2025
Installer
Eiffage
Engineering
Ingeniería Torne
159
panels
panels
128
kgCO2/year avoided
kgCO2/year avoided
Nursing home – Valencia (Spain)
Nursing home
Valencia
2024
Installer
Fulton
Engineering
-
32
panels
panels
-
kgCO2/year avoided
kgCO2/year avoided
Nursing Home – Kungsbacka (Sweden)
Nursing home
Kungsbacka, Suecia
2021
Installer
-
Engineering
-
126
panels
panels
56
kgCO2/year avoided
kgCO2/year avoided
Installation in a Hospital – Santiago (Chile)
Hospital
Santiago, Chile
2024
Installer
Uria
Engineering
Uria
117
panels
panels
79.499
kgCO2/year avoided
kgCO2/year avoided
Installation in Residence El Castillo – Asturias (Spain)
Nursing home
Asturias
2024
Installer
Inersa
Engineering
Ecubo
15
panels
panels
6.951
kgCO2/year avoided
kgCO2/year avoided
Torre Monreal Residence – Tudela (Spain)
Nursing home
Tudela (Spain)
2022
Installer
Gamio Denalan Obras y Servicios SL.
Engineering
-
100
panels
panels
67.145
kgCO2/year avoided
kgCO2/year avoided
Residence – Rosales del Canal (Spain)
Nursing home
Rosales del Canal (Spain)
2019
Installer
Tecmosa
Engineering
-
63
panels
panels
44.716
kgCO2/year avoided
kgCO2/year avoided
Campotejar Residence – Granada (Spain)
Nursing home
Granada (Spain)
2019
Installer
Ingener del Sur S.L.
Engineering
-
51
panels
panels
27.030
kgCO2/year avoided
kgCO2/year avoided
Casetas Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ambitec S.A.U.
Engineering
-
50
panels
panels
35.071
kgCO2/year avoided
kgCO2/year avoided
Vitalia Residence – Madrid (Spain)
Nursing home
Madrid (Spain)
2019
Installer
-
Engineering
-
23
panels
panels
17.922
kgCO2/year avoided
kgCO2/year avoided