Laundry – Huesca (Spain)

abora solar installation

Industry
Huesca (Spain)
2020
63 Panels
Number of solar panels
63
Use
DHW
Thermal production
88,827 kWh/year
Electrical production
32,158 kWh/year
Auxiliary system
Gas boiler
Total emissions savings
40,715 KgCO2
Installer
Climetel
Engineering
-
36 %
of energy savings
-- %
of CO2 emissions reduction

Testimonio

We have opted for the hybrid panel from Abora because in the same panel we can have both thermal and photovoltaic technology. In terms of profitability, we have seen that since the first day of operation, the panels have already been reducing parts of the bills for both gas and electricity month by month. We are doing quite well with the scores we had. This type of installation in companies also helps to reduce CO2 emissions and aids in protecting the environment. Additionally, it positions your company at the forefront of climate change initiatives, and if measures are implemented in the future to reduce CO2, your company will already be prepared to face such measures.
Marcelo Esco
Laundry Director I.T.L

They already trust us

Similar installations

Showing: 5 installations
Clear filter
Hermanos Garijo Farm – Zaragoza (Spain)
Farm
Zaragoza (Spain)
2023
Installer
MO2
Engineering
-
100
panels
92.692
kgCO2/year avoided
Industrial ARPA – Zaragoza (Spain)
Industry
Zaragoza (Spain)
2018
Installer
ARPA EAG
Engineering
-
112
panels
59.360
kgCO2/year avoided
SYTA Tanker Wash – Zaragoza (Spain)
Industry
Zaragoza (Spain)
2018
Installer
Elivere
Engineering
-
160
panels
84.800
kgCO2/year avoided
Car Wash – Hanko (Finland)
Industry
Hanko (Finland)
2023
Installer
KCG
Engineering
-
36
panels
900.000
kgCO2/year avoided

Don’t loose your time and your money, bet on us!