Industrial ARPA – Zaragoza (Spain)

abora solar installation

Industry
Zaragoza (Spain)
2018
112 Panels
Number of solar panels
112
Use
Air Conditioning + Electricity
Thermal production
146,479 kWh/year
Electrical production
39,756 kWh/year
Auxiliary system
-
Total emissions savings
59,360 KgCO2
Installer
ARPA EAG
Engineering
-
-- %
of energy savings
-- %
of CO2 emissions reduction

Testimonio

What benefits do we logically have with this installation? Well, we are truly convinced that we have taken a big step towards the sustainable development goals, and just one fact: we used to emit 25 tons of CO2 into the atmosphere through thermal energy, and in the two and a half months since the installation, we have saved 4.5 tons. This is already a very significant indicator for us, not only in economic terms but also in environmental terms.
Clara Arpa
Arpa Industry CEO

They already trust us

Similar installations

Showing: 7 installations
Clear filter
EOS Sauna Factory – Frankfurt (Germany)
Industry
Frankfurt
2025
Installer
TSF
Engineering
TSF
119
panels
60.160
kgCO2/year avoided
Car wash – Barbastro (Spain)
Industry
Barbastro
2024
Installer
-
Engineering
-
9
panels
2.693
kgCO2/year avoided
Hermanos Garijo Farm – Zaragoza (Spain)
Farm
Zaragoza (Spain)
2023
Installer
MO2
Engineering
-
100
panels
92.692
kgCO2/year avoided
SYTA Tanker Wash – Zaragoza (Spain)
Industry
Zaragoza (Spain)
2018
Installer
Elivere
Engineering
-
160
panels
84.800
kgCO2/year avoided
Industry – Helsinski (Finland)
Industry
Helsinski
2023
Installer
KCG
Engineering
-
90
panels
150.000
kgCO2/year avoided
Laundry – Huesca (Spain)
Industry
Huesca (Spain)
2020
Installer
Climetel
Engineering
-
63
panels
40.715
kgCO2/year avoided

Don’t loose your time and your money, bet on us!