Industrial ARPA – Zaragoza (Spain)

abora solar installation

Industry
Zaragoza (Spain)
2018
112 Panels
Number of solar panels
112
Use
Air Conditioning + Electricity
Electrical production
39756
Thermal production
146479
Auxiliary system
-
Total emissions savings
59360
Installer
ARPA EAG
Engineering
-
-- %
of energy savings
-- %
of CO2 emissions reduction

Testimonio

What benefits do we logically have with this installation? Well, we are truly convinced that we have taken a big step towards the sustainable development goals, and just one fact: we used to emit 25 tons of CO2 into the atmosphere through thermal energy, and in the two and a half months since the installation, we have saved 4.5 tons. This is already a very significant indicator for us, not only in economic terms but also in environmental terms.
Clara Arpa
Arpa Industry CEO

They already trust us

Similar installations

Showing: 5 installations
Clear filter
Hermanos Garijo Farm – Zaragoza (Spain)
Farm
Zaragoza (Spain)
2023
Installer
MO2
Engineering
-
100
panels
92.692
kgCO2/year avoided
SYTA Tanker Wash – Zaragoza (Spain)
Industry
Zaragoza (Spain)
2018
Installer
Elivere
Engineering
-
160
panels
84.800
kgCO2/year avoided
Car Wash – Hanko (Finland)
Industry
Hanko (Finland)
2023
Installer
KCG
Engineering
-
36
panels
900.000
kgCO2/year avoided
Laundry – Huesca (Spain)
Industry
Huesca (Spain)
2020
Installer
Climetel
Engineering
-
63
panels
40.715
kgCO2/year avoided

Don’t loose your time and your money, bet on us!