Hotel Santos Las Arenas – Valencia (Spain)
abora solar installation
Hotel
Valencia (Spain)
2023
122 Panels
Number of solar panels
122
Use
DHW + Pool
Thermal production
211,018 kWh/year
Electrical production
69,821 kWh/year
Auxiliary system
Gas boiler
Total emissions savings
98,551 KgCO2
Installer
Instalaciones Fonsa
Engineering
-
of energy savings
of CO2 emissions reduction
Similar installations
Showing: 19 installations
Clear filter
Museo de Barro Winery – La Bañeza (Spain)
Hotel
La Bañeza (Spain)
2018
Installer
Green's Projects
Engineering
-
4
panels
panels
2.682
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar – Tenerife (Spain)
Hotel
Tenerife (Spain)
2019
Installer
Grupo DAC
Engineering
-
102
panels
panels
86.544
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar Royal Andalus – Chiclana de la Frontera (Spain)
Hotel
Chiclana de la Frontera (Spain)
2020
Installer
Arki
Engineering
-
300
panels
panels
204.785
kgCO2/year avoided
kgCO2/year avoided
Hotel Loar – Menorca (Spain)
Hotel
Menorca (Spain)
2019
Installer
Barbercoll
Engineering
-
134
panels
panels
121.641
kgCO2/year avoided
kgCO2/year avoided
Hotel Resort – Gerona (Spain)
Hotel
Gerona (Spain)
2018
Installer
KPL Solar
Engineering
-
50
panels
panels
30.578
kgCO2/year avoided
kgCO2/year avoided
Hotel Sancho Abarca – Huesca (Spain)
Hotel
Huesca (Spain)
2019
Installer
Levitec
Engineering
-
18
panels
panels
13.294
kgCO2/year avoided
kgCO2/year avoided
Hotel – Boltaña (Spain)
Hotel
Boltaña (Spain)
2021
Installer
-
Engineering
-
34
panels
panels
16.601
kgCO2/year avoided
kgCO2/year avoided
Hotel – The Hague (Netherlands)
Hotel
The Hague (Netherlands)
2021
Installer
Solarus
Engineering
-
12
panels
panels
5.693
kgCO2/year avoided
kgCO2/year avoided
Hotel – Poço e Meio (Portugal)
Hotel
Poço e Meio (Portugal)
2020
Installer
Filotipo
Engineering
-
6
panels
panels
7.067
kgCO2/year avoided
kgCO2/year avoided
Hotel – South Africa
Hotel
South Africa
2021
Installer
Solarus
Engineering
-
20
panels
panels
20.418
kgCO2/year avoided
kgCO2/year avoided