Hotel Loar – Menorca (Spain)
abora solar installation
Hotel
Menorca (Spain)
2019
134 Panels
Number of solar panels
134
Use
DHW
Electrical production
64047
Thermal production
202905
Auxiliary system
Diesel boiler
Total emissions savings
121641
Installer
Barbercoll
Engineering
-
of energy savings
of CO2 emissions reduction
Similar installations
Showing: 24 installations
Clear filter
Museo de Barro Winery – La Bañeza (Spain)
Hotel
La Bañeza (Spain)
2018
Installer
Green's Projects
Engineering
-
4
panels
panels
2.682
kgCO2/year avoided
kgCO2/year avoided
Hotel Resort – Gerona (Spain)
Hotel
Gerona (Spain)
2018
Installer
KPL Solar
Engineering
-
50
panels
panels
30.578
kgCO2/year avoided
kgCO2/year avoided
Hotel Sancho Abarca – Huesca (Spain)
Hotel
Huesca (Spain)
2019
Installer
Levitec
Engineering
-
18
panels
panels
13.294
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar – Tenerife (Spain)
Hotel
Tenerife (Spain)
2019
Installer
Grupo DAC
Engineering
-
102
panels
panels
86.544
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar Royal Andalus – Chiclana de la Frontera (Spain)
Hotel
Chiclana de la Frontera (Spain)
2020
Installer
Arki
Engineering
-
300
panels
panels
204.785
kgCO2/year avoided
kgCO2/year avoided
Hotel – Boltaña (Spain)
Hotel
Boltaña (Spain)
2021
Installer
-
Engineering
-
34
panels
panels
16.601
kgCO2/year avoided
kgCO2/year avoided
Hotel – The Hague (Netherlands)
Hotel
The Hague (Netherlands)
2021
Installer
Solarus
Engineering
-
12
panels
panels
5.693
kgCO2/year avoided
kgCO2/year avoided
Hotel – Poço e Meio (Portugal)
Hotel
Poço e Meio (Portugal)
2020
Installer
Filotipo
Engineering
-
6
panels
panels
7.067
kgCO2/year avoided
kgCO2/year avoided
Hotel – South Africa
Hotel
South Africa
2021
Installer
Solarus
Engineering
-
20
panels
panels
20.418
kgCO2/year avoided
kgCO2/year avoided
Hotel Hacienda Na Xamena – Ibiza (Spain)
Hotel
Ibiza (Spain)
2023
Installer
-
Engineering
Ingeniería MASRED
63
panels
panels
61.070
kgCO2/year avoided
kgCO2/year avoided