Hotel Iberostar – Tenerife (Spain)
abora solar installation
Hotel
Tenerife (Spain)
2019
102 Panels
Number of solar panels
102
Use
DHW
Electrical production
40470 kWh/year
Thermal production
181206 kWh/year
Auxiliary system
Gas boiler
Total emissions savings
86544 KgCO2
Installer
Grupo DAC
Engineering
-
of energy savings
of CO2 emissions reduction
Testimonio

We have opted for hybrid solar panels because they provide us with the part of photovoltaic electricity and the part of solar thermal energy that is very necessary in our hotels. Why have we opted for this particular technology? Because it is the technology that makes the most use of the surface and makes the most use of irradiation and as hotel surfaces are limited has been the best choice. Obviously it will be a favorable impact on the electricity bill and not only the electricity bill but also the thermal bill because we use natural gas to produce hot water so thanks to the hybrids the cost will be reduced.
Pepe González
Project Engineer Grupo Iberostar
Similar installations
Showing: 25 installations
Clear filter
Installation in Sports Center San Ignacio – Bilbao (Spain)
Sport Center
Bilbao
2024
Installer
Veolia
Engineering
CEI Asociados
128
panels
panels
81.585
kgCO2/year avoided
kgCO2/year avoided
Museo de Barro Winery – La Bañeza (Spain)
Hotel
La Bañeza (Spain)
2018
Installer
Green's Projects
Engineering
-
4
panels
panels
2.682
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar Royal Andalus – Chiclana de la Frontera (Spain)
Hotel
Chiclana de la Frontera (Spain)
2020
Installer
Arki
Engineering
-
300
panels
panels
204.785
kgCO2/year avoided
kgCO2/year avoided
Hotel Loar – Menorca (Spain)
Hotel
Menorca (Spain)
2019
Installer
Barbercoll
Engineering
-
134
panels
panels
121.641
kgCO2/year avoided
kgCO2/year avoided
Hotel Resort – Gerona (Spain)
Hotel
Gerona (Spain)
2018
Installer
KPL Solar
Engineering
-
50
panels
panels
30.578
kgCO2/year avoided
kgCO2/year avoided
Hotel Sancho Abarca – Huesca (Spain)
Hotel
Huesca (Spain)
2019
Installer
Levitec
Engineering
-
18
panels
panels
13.294
kgCO2/year avoided
kgCO2/year avoided
Hotel Santos Las Arenas – Valencia (Spain)
Hotel
Valencia (Spain)
2023
Installer
Instalaciones Fonsa
Engineering
-
122
panels
panels
98.551
kgCO2/year avoided
kgCO2/year avoided
Hotel Santos Nelva – Murcia (Spain)
Hotel
Murcia (Spain)
2023
Installer
Grupo Pastor
Engineering
-
98
panels
panels
84.290
kgCO2/year avoided
kgCO2/year avoided
Hotel Villa Maria – Santa Barbara de Nexe (Portugal)
Hotel
Santa Barbara de Nexe (Portugal)
2020
Installer
Filotipo
Engineering
-
4
panels
panels
5.599
kgCO2/year avoided
kgCO2/year avoided
Hotel – Boltaña (Spain)
Hotel
Boltaña (Spain)
2021
Installer
-
Engineering
-
34
panels
panels
16.601
kgCO2/year avoided
kgCO2/year avoided