Hotel Iberostar Albufera Park – Mallorca (Spain)

abora solar installation

Hotel
Mallorca (Spain)
2023
180 Panels
Number of solar panels
180
Use
DHW + Pool
Electrical production
70988
Thermal production
274068
Auxiliary system
Diesel boiler
Total emissions savings
174693
Installer
Estel Ingeniería
Engineering
Estel Ingeniería
69 %
of energy savings
-- %
of CO2 emissions reduction

Testimonio

We have opted for hybrid solar panels because they provide us with the part of photovoltaic electricity and the part of solar thermal energy that is very necessary in our hotels. Why have we opted for this particular technology? Because it is the technology that makes the most use of the surface and makes the most use of irradiation and as hotel surfaces are limited has been the best choice. Obviously it will be a favorable impact on the electricity bill and not only the electricity bill but also the thermal bill because we use natural gas to produce hot water so thanks to the hybrids the cost will be reduced.
Pepe González
Project Engineer Grupo Iberostar

Similar installations

Showing: 24 installations
Clear filter
Museo de Barro Winery – La Bañeza (Spain)
Hotel
La Bañeza (Spain)
2018
Installer
Green's Projects
Engineering
-
4
panels
2.682
kgCO2/year avoided
Hotel Iberostar – Tenerife (Spain)
Hotel
Tenerife (Spain)
2019
Installer
Grupo DAC
Engineering
-
102
panels
86.544
kgCO2/year avoided
Hotel Iberostar Royal Andalus – Chiclana de la Frontera (Spain)
Hotel
Chiclana de la Frontera (Spain)
2020
Installer
Arki
Engineering
-
300
panels
204.785
kgCO2/year avoided
Hotel Loar – Menorca (Spain)
Hotel
Menorca (Spain)
2019
Installer
Barbercoll
Engineering
-
134
panels
121.641
kgCO2/year avoided
Hotel Resort – Gerona (Spain)
Hotel
Gerona (Spain)
2018
Installer
KPL Solar
Engineering
-
50
panels
30.578
kgCO2/year avoided
Hotel Sancho Abarca – Huesca (Spain)
Hotel
Huesca (Spain)
2019
Installer
Levitec
Engineering
-
18
panels
13.294
kgCO2/year avoided
Hotel – South Africa
Hotel
South Africa
2021
Installer
Solarus
Engineering
-
20
panels
20.418
kgCO2/year avoided
Hotel Hacienda Na Xamena – Ibiza (Spain)
Hotel
Ibiza (Spain)
2023
Installer
-
Engineering
Ingeniería MASRED
63
panels
61.070
kgCO2/year avoided
Hotel Iberostar Jardín del Sol – Mallorca (Spain)
Hotel
Mallorca (Spain)
2022
Installer
-
Engineering
-
162
panels
170.325
kgCO2/year avoided
Hotel Iberostar Las Dalias – Tenerife (Spain)
Hotel
Tenerife (Spain)
2021
Installer
Grupo DAC
Engineering
-
240
panels
256.542
kgCO2/year avoided
Hotel Lago – Menorca (Spain)
Hotel
Menorca (Spain)
2021
Installer
-
Engineering
Cofrica
134
panels
142.304
kgCO2/year avoided
Hotel Pacoche – Murcia (Spain)
Hotel
Murcia (Spain)
2023
Installer
FAJARDO ENERGÍAS
Engineering
-
30
panels
26.968
kgCO2/year avoided
Hotel Santos Las Arenas – Valencia (Spain)
Hotel
Valencia (Spain)
2023
Installer
Instalaciones Fonsa
Engineering
-
122
panels
98.551
kgCO2/year avoided
Hotel Santos Nelva – Murcia (Spain)
Hotel
Murcia (Spain)
2023
Installer
Grupo Pastor
Engineering
-
98
panels
84.290
kgCO2/year avoided
Hotel Villa Maria – Santa Barbara de Nexe (Portugal)
Hotel
Santa Barbara de Nexe (Portugal)
2020
Installer
Filotipo
Engineering
-
4
panels
5.599
kgCO2/year avoided
Hotel – Boltaña (Spain)
Hotel
Boltaña (Spain)
2021
Installer
-
Engineering
-
34
panels
16.601
kgCO2/year avoided
Hotel – The Hague (Netherlands)
Hotel
The Hague (Netherlands)
2021
Installer
Solarus
Engineering
-
12
panels
5.693
kgCO2/year avoided
Hotel – Poço e Meio (Portugal)
Hotel
Poço e Meio (Portugal)
2020
Installer
Filotipo
Engineering
-
6
panels
7.067
kgCO2/year avoided
Sports Center – San Cugat del Vallés (Spain)
Sport Center
San Cugat del Vallés (Spain)
2018
Installer
Tevigrup
Engineering
-
160
panels
84.800
kgCO2/year avoided
Swimming Club – Barcelona (Spain)
Sport Center
Barcelona (Spain)
2023
Installer
Grupo Construcía
Engineering
Grupo Construcía
1041
panels
774.809
kgCO2/year avoided
El Fango Sports Center – Bilbao (Spain)
Sport Center
Bilbao (Spain)
2023
Installer
Elecnor
Engineering
-
72
panels
53.640
kgCO2/year avoided
Sports Center – Tauste (Spain)
Sport Center
Tauste (Spain)
2022
Installer
Grupo EWD
Engineering
-
204
panels
41.541
kgCO2/year avoided
Teresa Perales Sports Center – Cuarte de Huerva (Zaragoza)
Sport Center
Cuarte de Huerva (Zaragoza)
2023
Installer
Grupo Cobra
Engineering
Rubén Mungía
48
panels
-
kgCO2/year avoided