Hotel Iberostar Albufera Park – Mallorca (Spain)
abora solar installation
Hotel
Mallorca (Spain)
2023
180 Panels
Number of solar panels
180
Use
DHW + Pool
Electrical production
70988
Thermal production
274068
Auxiliary system
Diesel boiler
Total emissions savings
174693
Installer
Estel Ingeniería
Engineering
Estel Ingeniería
of energy savings
of CO2 emissions reduction
Testimonio
We have opted for hybrid solar panels because they provide us with the part of photovoltaic electricity and the part of solar thermal energy that is very necessary in our hotels. Why have we opted for this particular technology? Because it is the technology that makes the most use of the surface and makes the most use of irradiation and as hotel surfaces are limited has been the best choice. Obviously it will be a favorable impact on the electricity bill and not only the electricity bill but also the thermal bill because we use natural gas to produce hot water so thanks to the hybrids the cost will be reduced.
Pepe González
Project Engineer Grupo Iberostar
Similar installations
Showing: 24 installations
Clear filter
Museo de Barro Winery – La Bañeza (Spain)
Hotel
La Bañeza (Spain)
2018
Installer
Green's Projects
Engineering
-
4
panels
panels
2.682
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar – Tenerife (Spain)
Hotel
Tenerife (Spain)
2019
Installer
Grupo DAC
Engineering
-
102
panels
panels
86.544
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar Royal Andalus – Chiclana de la Frontera (Spain)
Hotel
Chiclana de la Frontera (Spain)
2020
Installer
Arki
Engineering
-
300
panels
panels
204.785
kgCO2/year avoided
kgCO2/year avoided
Hotel Loar – Menorca (Spain)
Hotel
Menorca (Spain)
2019
Installer
Barbercoll
Engineering
-
134
panels
panels
121.641
kgCO2/year avoided
kgCO2/year avoided
Hotel Resort – Gerona (Spain)
Hotel
Gerona (Spain)
2018
Installer
KPL Solar
Engineering
-
50
panels
panels
30.578
kgCO2/year avoided
kgCO2/year avoided
Hotel Sancho Abarca – Huesca (Spain)
Hotel
Huesca (Spain)
2019
Installer
Levitec
Engineering
-
18
panels
panels
13.294
kgCO2/year avoided
kgCO2/year avoided
Hotel – South Africa
Hotel
South Africa
2021
Installer
Solarus
Engineering
-
20
panels
panels
20.418
kgCO2/year avoided
kgCO2/year avoided
Hotel Hacienda Na Xamena – Ibiza (Spain)
Hotel
Ibiza (Spain)
2023
Installer
-
Engineering
Ingeniería MASRED
63
panels
panels
61.070
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar Jardín del Sol – Mallorca (Spain)
Hotel
Mallorca (Spain)
2022
Installer
-
Engineering
-
162
panels
panels
170.325
kgCO2/year avoided
kgCO2/year avoided
Hotel Iberostar Las Dalias – Tenerife (Spain)
Hotel
Tenerife (Spain)
2021
Installer
Grupo DAC
Engineering
-
240
panels
panels
256.542
kgCO2/year avoided
kgCO2/year avoided