Hospital – Cape Town (South Africa)

abora solar installation

Hospital
Cape Town
2025
100 Panels
Number of solar panels
100
Use
DHW + electricity
Thermal production
102,933 kWh/year
Electrical production
47,034 kWh/year
Auxiliary system
Heat pump
Total emissions savings
188,646 KgCO2
Installer
-
Engineering
-
89 %
of energy savings
80 %
of CO2 emissions reduction

Objectives

  • Implement energy saving measures.
  • Reduce your carbon footprint.
  • Increase the use of renewable energies.
  • Reduce the use of fossil fuels.

Limitations

  • As a historic building, it required approval from the Heritage Department.

They already trust us

Similar installations

Showing: 20 installations
Clear filter
Health centre – Barbastro (Spain)
Hospital
Barbastro
2025
Installer
Incliza
Engineering
Ingeniería Torné
120
panels
122.735
kgCO2/year avoided
Hospital – Cape Gate (South Africa)
Hospital
Cape Town Northern Suburbs
2024
Installer
-
Engineering
-
50
panels
120.012
kgCO2/year avoided
Hospital – Teruel (Spain)
Hospital
Teruel, España
2025
Installer
Eiffage
Engineering
Ingeniería Torne
159
panels
128
kgCO2/year avoided
Nursing home – Valencia (Spain)
Nursing home
Valencia
2024
Installer
Fulton
Engineering
-
32
panels
-
kgCO2/year avoided
Nursing Home – Kungsbacka (Sweden)
Nursing home
Kungsbacka, Suecia
2021
Installer
-
Engineering
-
126
panels
50
kgCO2/year avoided
Installation in a Hospital – Santiago (Chile)
Hospital
Santiago, Chile
2024
Installer
Uria
Engineering
Uria
117
panels
79.499
kgCO2/year avoided
Installation in Residence El Castillo – Asturias (Spain)
Nursing home
Asturias
2024
Installer
Inersa
Engineering
Ecubo
15
panels
6.951
kgCO2/year avoided
Torre Monreal Residence – Tudela (Spain)
Nursing home
Tudela (Spain)
2022
Installer
Gamio Denalan Obras y Servicios SL.
Engineering
-
100
panels
67.145
kgCO2/year avoided
Residence – Rosales del Canal (Spain)
Nursing home
Rosales del Canal (Spain)
2019
Installer
Tecmosa
Engineering
-
63
panels
44.716
kgCO2/year avoided
Campotejar Residence – Granada (Spain)
Nursing home
Granada (Spain)
2019
Installer
Ingener del Sur S.L.
Engineering
-
51
panels
27.030
kgCO2/year avoided
Casetas Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ambitec S.A.U.
Engineering
-
50
panels
35.071
kgCO2/year avoided
Vitalia Residence – Madrid (Spain)
Nursing home
Madrid (Spain)
2019
Installer
-
Engineering
-
23
panels
17.922
kgCO2/year avoided
Vitalia Residence – Málaga (Spain)
Nursing home
Málaga (Spain)
2018
Installer
-
Engineering
-
64
panels
33.920
kgCO2/year avoided
Vitalia Residence – Toledo (Spain)
Nursing home
Toledo (Spain)
2018
Installer
FLUHIDRA INSTALACIONES
Engineering
-
64
panels
33.920
kgCO2/year avoided
Vitalia Residence – Torrejón de Ardoz (Spain)
Nursing home
Torrejón de Ardoz (Spain)
2019
Installer
Grupo Intra s.a
Engineering
-
78
panels
37.242
kgCO2/year avoided
Vitalia Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ecoclima
Engineering
-
64
panels
33.920
kgCO2/year avoided
Solera Asistencial Residence – Pamplona (Spain)
Nursing home
Pamplona (Spain)
2022
Installer
GAMIO DENALAN OBRAS Y SERVICIOS SL.
Engineering
-
136
panels
92.365
kgCO2/year avoided
CIBA Biomedical Research Center of Aragón – Zaragoza (Spain)
Hospital
Zaragoza (Spain)
2023
Installer
Grupo Cobra
Engineering
-
58
panels
83.020
kgCO2/year avoided
Maz – Zaragoza (Spain)
Hospital
Zaragoza (Spain)
2023
Installer
Veolia
Engineering
-
90
panels
66.684
kgCO2/year avoided

Don’t loose your time and your money, bet on us!