Hermanos Garijo Farm – Zaragoza (Spain)

abora solar installation

Farm
Zaragoza (Spain)
2023
100 Panels
Number of solar panels
100
Use
DHW + Heating
Electrical production
46509
Thermal production
149434
Auxiliary system
Gas boiler
Total emissions savings
92692
Installer
MO2
Engineering
-
53 %
of energy savings
-- %
of CO2 emissions reduction

They already trust us

Similar installations

Showing: 5 installations
Clear filter
Industrial ARPA – Zaragoza (Spain)
Industry
Zaragoza (Spain)
2018
Installer
ARPA EAG
Engineering
-
112
panels
59.360
kgCO2/year avoided
SYTA Tanker Wash – Zaragoza (Spain)
Industry
Zaragoza (Spain)
2018
Installer
Elivere
Engineering
-
160
panels
84.800
kgCO2/year avoided
Car Wash – Hanko (Finland)
Industry
Hanko (Finland)
2023
Installer
KCG
Engineering
-
36
panels
900.000
kgCO2/year avoided
Laundry – Huesca (Spain)
Industry
Huesca (Spain)
2020
Installer
Climetel
Engineering
-
63
panels
40.715
kgCO2/year avoided

Don’t loose your time and your money, bet on us!