EOS Sauna Factory – Frankfurt (Germany)

abora solar installation

Industry
Frankfurt
2025
119 Panels
Number of solar panels
119
Use
DHW + electricity
Thermal production
135,606 kWh/year
Electrical production
41,461 kWh/year
Auxiliary system
-
Total emissions savings
60,160 KgCO2
Installer
TSF
Engineering
TSF
82 %
of energy savings
87 %
of CO2 emissions reduction

They already trust us

Similar installations

Showing: 7 installations
Clear filter
Car wash – Barbastro (Spain)
Industry
Barbastro
2024
Installer
-
Engineering
-
9
panels
2.693
kgCO2/year avoided
Hermanos Garijo Farm – Zaragoza (Spain)
Farm
Zaragoza (Spain)
2023
Installer
MO2
Engineering
-
100
panels
92.692
kgCO2/year avoided
Industrial ARPA – Zaragoza (Spain)
Industry
Zaragoza (Spain)
2018
Installer
ARPA EAG
Engineering
-
112
panels
59.360
kgCO2/year avoided
SYTA Tanker Wash – Zaragoza (Spain)
Industry
Zaragoza (Spain)
2018
Installer
Elivere
Engineering
-
160
panels
84.800
kgCO2/year avoided
Industry – Helsinski (Finland)
Industry
Helsinski
2023
Installer
KCG
Engineering
-
90
panels
150.000
kgCO2/year avoided
Laundry – Huesca (Spain)
Industry
Huesca (Spain)
2020
Installer
Climetel
Engineering
-
63
panels
40.715
kgCO2/year avoided

Don’t loose your time and your money, bet on us!