CIBA Biomedical Research Center of Aragón – Zaragoza (Spain)

abora solar installation

Hospital
Zaragoza (Spain)
2023
58 Panels
Number of solar panels
58
Use
DHW
Electrical production
103140
Thermal production
125527
Auxiliary system
Diesel boiler
Total emissions savings
83020
Installer
Grupo Cobra
Engineering
-
7 %
of energy savings
-- %
of CO2 emissions reduction

They already trust us

Similar installations

Showing: 12 installations
Clear filter
Torre Monreal Residence – Tudela (Spain)
Nursing home
Tudela (Spain)
2022
Installer
Gamio Denalan Obras y Servicios SL.
Engineering
-
100
panels
67.145
kgCO2/year avoided
Residence – Rosales del Canal (Spain)
Nursing home
Rosales del Canal (Spain)
2019
Installer
Tecmosa
Engineering
-
63
panels
44.716
kgCO2/year avoided
Campotejar Residence – Granada (Spain)
Nursing home
Granada (Spain)
2019
Installer
Ingener del Sur S.L.
Engineering
-
51
panels
27.030
kgCO2/year avoided
Casetas Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ambitec S.A.U.
Engineering
-
50
panels
35.071
kgCO2/year avoided
Vitalia Residence – Madrid (Spain)
Nursing home
Madrid (Spain)
2019
Installer
-
Engineering
-
23
panels
17.922
kgCO2/year avoided
Vitalia Residence – Málaga (Spain)
Nursing home
Málaga (Spain)
2018
Installer
-
Engineering
-
64
panels
33.920
kgCO2/year avoided
Vitalia Residence – Toledo (Spain)
Nursing home
Toledo (Spain)
2018
Installer
FLUHIDRA INSTALACIONES
Engineering
-
64
panels
33.920
kgCO2/year avoided
Vitalia Residence – Torrejón de Ardoz (Spain)
Nursing home
Torrejón de Ardoz (Spain)
2019
Installer
Grupo Intra s.a
Engineering
-
78
panels
37.242
kgCO2/year avoided
Vitalia Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ecoclima
Engineering
-
64
panels
33.920
kgCO2/year avoided
Solera Asistencial Residence – Pamplona (Spain)
Nursing home
Pamplona (Spain)
2022
Installer
GAMIO DENALAN OBRAS Y SERVICIOS SL.
Engineering
-
136
panels
92.365
kgCO2/year avoided
Maz – Zaragoza (Spain)
Hospital
Zaragoza (Spain)
2023
Installer
Veolia
Engineering
-
90
panels
66.684
kgCO2/year avoided

Don’t loose your time and your money, bet on us!