CESTE: International Business School – Zaragoza (Spain)
abora solar installation
Students Housing
Zaragoza (Spain)
2021
40 Panels
Number of solar panels
40
Use
DHW
Electrical production
18827 kWh/year
Thermal production
75791 kWh/year
Auxiliary system
Gas boiler
Total emissions savings
36839 KgCO2
Installer
Rade
Engineering
-
of energy savings
of CO2 emissions reduction
Similar installations
Showing: 32 installations
Clear filter
District Network Poland
Urban network
Poland
2023
Installer
-
Engineering
-
60
panels
panels
36.497
kgCO2/year avoided
kgCO2/year avoided
District Network Cuenca
Urban network
Cuenca
2024
Installer
REBI
Engineering
REBI
1090
panels
panels
304.301
kgCO2/year avoided
kgCO2/year avoided
District Network Olvega Soria
Urban network
Soria
2023
Installer
REBI
Engineering
REBI
552
panels
panels
124.337
kgCO2/year avoided
kgCO2/year avoided
Multi-dwelling – Oviedo (Spain)
Multi-housing
Oviedo, Asturias
2023
Installer
Uria
Engineering
Uria
20
panels
panels
12.820
kgCO2/year avoided
kgCO2/year avoided
Installation in Multi-dwelling – Oviedo (Asturias)
Multi-housing
Oviedo, Asturias
2024
Installer
Alegas
Engineering
Multitek
21
panels
panels
14.000
kgCO2/year avoided
kgCO2/year avoided
Multi-dwelling Oviedo
Multi-housing
Oviedo, Asturias
2024
Installer
Inersa
Engineering
Ecubo
5
panels
panels
3.500
kgCO2/year avoided
kgCO2/year avoided
Single-family – Marseille (France)
Single-family-home
Marseille (France)
2019
Installer
-
Engineering
-
38
panels
panels
18.811
kgCO2/year avoided
kgCO2/year avoided
Single-family – Montecanal (Spain)
Single-family-home
Zaragoza (Spain)
2018
Installer
-
Engineering
-
14
panels
panels
6.376
kgCO2/year avoided
kgCO2/year avoided
Single-family – Zaragoza (Spain)
Single-family-home
Zaragoza (Spain)
2020
Installer
-
Engineering
-
10
panels
panels
7.437
kgCO2/year avoided
kgCO2/year avoided
Single-family – Saint-Alban-de-Roche (France)
Single-family-home
Saint-Alban-de-Roche (France)
2020
Installer
-
Engineering
-
6
panels
panels
739
kgCO2/year avoided
kgCO2/year avoided