Hybrid solar panel, the ideal solution for your sector
The solar panel, 100% made in Spain, most efficient and profitable in the world. More than 40,000 m2 installed in more than 38 countries.
Find your installation
View by sectors
View by installation type
View by climate type
Urban network
Multi-housing
Industry
Sport Center
Single-family-home
Hotel
Public center
Hospital
Nursing home
Farm
Students Housing
Structure type

Structure coplanar

Structure inclinada
Fuel type

Gas natural

Gas propano

Biomasa

Electricidad

Gasoil
Area 1
>500 kWh/m2
Area 2
>860 kWh/m2
Area 3
>1220 kWh/m2
Area 4
>1580 kWh/m2
Area 5
>1940 kWh/m2
Showing: 99 installations
Clear filter
District heating – Abensberg (Germany)
Urban network
Abensberg
2025
Installer
Varmeco
Engineering
Varmeco
118
panels
panels
66.472
kgCO2/year avoided
kgCO2/year avoided
Multidwelling Adlerweg – Chur (Switzerland)
Multi-housing
Chur
2024
Installer
Sky Technik
Engineering
Sky Technik
54
panels
panels
35.445
kgCO2/year avoided
kgCO2/year avoided
Multidwelling Scalettastr – Chur (Switzerland)
Multi-housing
Chur
2025
Installer
Sky Technik
Engineering
Sky Technik
54
panels
panels
35.444
kgCO2/year avoided
kgCO2/year avoided
EOS Sauna Factory – Frankfurt (Germany)
Industry
Frankfurt
2025
Installer
TSF
Engineering
TSF
119
panels
panels
60.160
kgCO2/year avoided
kgCO2/year avoided
Puente Genil Sports Centre – Cordoba (Spain)
Sport Center
Cordoba
2025
Installer
Naturclima
Engineering
Lomoa Ingenieria
71
panels
panels
96.045
kgCO2/year avoided
kgCO2/year avoided
Installation in a single-family home – Hamburg (Germany)
Single-family-home
Hamburg
2025
Installer
ATEC
Engineering
ATEC
4
panels
panels
595
kgCO2/year avoided
kgCO2/year avoided
Ibis Gent Centrum – Ghent (Belgium)
Hotel
Ghent
2024
Installer
-
Engineering
-
44
panels
panels
7.114
kgCO2/year avoided
kgCO2/year avoided
Hotel Drei Quellen Therme – Bad Griesbach (Germany)
Hotel
Bad Griesbach
2024
Installer
-
Engineering
-
172
panels
panels
2.927
kgCO2/year avoided
kgCO2/year avoided
Mid-Kent College – London (United Kingdom)
Public center
London
2025
Installer
-
Engineering
-
600
panels
panels
89.710
kgCO2/year avoided
kgCO2/year avoided
Car wash – Barbastro (Spain)
Industry
Barbastro
2024
Installer
-
Engineering
-
9
panels
panels
2.693
kgCO2/year avoided
kgCO2/year avoided