Hybrid solar panel, the ideal solution for your sector
The solar panel, 100% made in Spain, most efficient and profitable in the world. More than 40,000 m2 installed in more than 38 countries.
Find your installation
View by sectors
View by installation type
View by climate type
Urban network
Nursing home
Multi-housing
Hospital
Sport Center
Single-family-home
Public center
Hotel
Farm
Students Housing
Industry
Structure type

Structure coplanar

Structure inclinada
Fuel type

Gas natural

Gas propano

Biomasa

Electricidad

Gasoil

Area 1
>500 kWh/m2
Area 2
>860 kWh/m2
Area 3
>1220 kWh/m2
Area 4
>1580 kWh/m2
Area 5
>1940 kWh/m2
Showing: 81 installations
Clear filter
District Network Poland
Urban network
Poland
2023
Installer
-
Engineering
-
60
panels
panels
36.497
kgCO2/year avoided
kgCO2/year avoided
District Network Cuenca
Urban network
Cuenca
2024
Installer
REBI
Engineering
REBI
1090
panels
panels
304.301
kgCO2/year avoided
kgCO2/year avoided
District Network Olvega Soria
Urban network
Soria
2023
Installer
REBI
Engineering
REBI
552
panels
panels
124.337
kgCO2/year avoided
kgCO2/year avoided
Nursing Home – Kungsbacka (Sweden)
Nursing home
Kungsbacka, Suecia
2021
Installer
-
Engineering
-
126
panels
panels
56
kgCO2/year avoided
kgCO2/year avoided
Multi-dwelling – Oviedo (Spain)
Multi-housing
Oviedo, Asturias
2023
Installer
Uria
Engineering
Uria
20
panels
panels
12.820
kgCO2/year avoided
kgCO2/year avoided
Installation in Multi-dwelling – Oviedo (Asturias)
Multi-housing
Oviedo, Asturias
2024
Installer
Alegas
Engineering
Multitek
21
panels
panels
14.000
kgCO2/year avoided
kgCO2/year avoided
Multi-dwelling Oviedo
Multi-housing
Oviedo, Asturias
2024
Installer
Inersa
Engineering
Ecubo
5
panels
panels
3.500
kgCO2/year avoided
kgCO2/year avoided
Installation in a Hospital – Santiago (Chile)
Hospital
Santiago, Chile
2024
Installer
Uria
Engineering
Uria
117
panels
panels
79.499
kgCO2/year avoided
kgCO2/year avoided
Installation in Sports Center San Ignacio – Bilbao (Spain)
Sport Center
Bilbao
2024
Installer
Veolia
Engineering
CEI Asociados
128
panels
panels
81.585
kgCO2/year avoided
kgCO2/year avoided
Installation in Residence El Castillo – Asturias (Spain)
Nursing home
Asturias
2024
Installer
Inersa
Engineering
Ecubo
15
panels
panels
6.951
kgCO2/year avoided
kgCO2/year avoided