Your distributor

abora trusted professionals

Easily locate an Abora Solar installer in your area for your own hybrid installation!

Our installers are formed by Abora Solar. This provides you with a reliable and competent partner offering you the latest solutions and products.

Abora United Kingdom

Unit 12 Doric Business Centre,
Avon Way, Trowbridge, Wiltshire,
BA14 8FW, England UK

+44 (0)1373 896366
uk@abora-solar.com
ireland@abora-solar.com

Monday to Friday from 09h00 to 17h00

Plan your hybrid installation with abora

Find your nearest specialized installer Abora

We make a study of your hybrid installation Abora

The panels are installed on your roof and monitored so that you have absolute control in your installation

My Hybrid Project

Use our simulator to see your hybrid solar installation and learn about all its advantages.

Monitor

Discover our monitoring system, aHMonitor and everything it offers.

Discover our installations

District Heating- Corsica (France)
Urban network
Corsica
2023
Installer
-
Engineering
-
230
panels
55.662
kgCO2/year avoided
Health centre – Barbastro (Spain)
Hospital
Barbastro
2025
Installer
Incliza
Engineering
Ingeniería Torné
120
panels
122.735
kgCO2/year avoided
District heating – Abensberg (Germany)
Urban network
Abensberg
2025
Installer
Varmeco
Engineering
Varmeco
118
panels
66.472
kgCO2/year avoided
Multidwelling Adlerweg – Chur (Switzerland)
Multi-housing
Chur
2024
Installer
Sky Technik
Engineering
Sky Technik
54
panels
35.445
kgCO2/year avoided
EOS Sauna Factory – Frankfurt (Germany)
Industry
Frankfurt
2025
Installer
TSF
Engineering
TSF
119
panels
60.160
kgCO2/year avoided
Mid-Kent College – London (United Kingdom)
Public center
London
2025
Installer
-
Engineering
-
600
panels
89.710
kgCO2/year avoided
Car wash – Barbastro (Spain)
Industry
Barbastro
2024
Installer
-
Engineering
-
9
panels
2.693
kgCO2/year avoided
Civil Guard Headquarters – Jaca (Spain)
Single-family-home
Jaca (Huesca)
2025
Installer
-
Engineering
-
90
panels
72.307
kgCO2/year avoided
Hospital – Cape Town (South Africa)
Hospital
Cape Town
2025
Installer
-
Engineering
-
100
panels
188.646
kgCO2/year avoided
University of Philosophy – Zaragoza (Spain)
Public center
Zaragoza, España
2024
Installer
Eiffage
Engineering
Ingeniería Torne
112
panels
75.318
kgCO2/year avoided
Hospital – Teruel (Spain)
Hospital
Teruel, España
2025
Installer
Eiffage
Engineering
Ingeniería Torne
159
panels
128
kgCO2/year avoided
OECD Building – Paris (France)
Public center
Paris (France)
2021
Installer
Climasphere
Engineering
-
140
panels
52.955
kgCO2/year avoided
Hotel Iberostar Royal Andalus – Chiclana de la Frontera (Spain)
Hotel
Chiclana de la Frontera (Spain)
2020
Installer
Arki
Engineering
-
300
panels
204.785
kgCO2/year avoided
Hotel Iberostar Las Dalias – Tenerife (Spain)
Hotel
Tenerife (Spain)
2021
Installer
Grupo DAC
Engineering
-
240
panels
256.542
kgCO2/year avoided
Swimming Club – Barcelona (Spain)
Sport Center
Barcelona (Spain)
2023
Installer
Grupo Construcía
Engineering
Grupo Construcía
1041
panels
774.809
kgCO2/year avoided

Decarbonizing your building efficiently and cost-effectively, it has never been easier