Finance 100% of your hybrid solar installation.

At Abora we always look for the best solution to make savings above the funding fee.

Certificates of Energy Savings

The solar hybrid panels are the only ones who produce CAES.

The price of CAES involve the 40% of the cost of our solar hybrid panel.

Find out about the CAEs here.

Financial partners

Our Financial Partners (traditional banks, energy service companies, investment funds or crowfunding) are always adapted to the needs of our customers so that they do not have to make any contribution.

Install our panels in convenient installments. Order your study first and then apply for funding when you pay.

Funding

With our hybrid panel you can finance your installation with national, regional or local subsidies, since it is both a thermal and a photovoltaic opens up much more possibilities.

  • See national grants: IDAE
  • See regional grants: Go to your community’s government website
  • See local subsidies: Find out about the IBI bonus in your municipality

My Hybrid Project

Use our simulator to see your hybrid solar installation and learn about all its advantages.

Discover our installations

University of Philosophy – Zaragoza (Spain)
Public center
Zaragoza, España
2024
Installer
Eiffage
Engineering
Ingeniería Torne
112
panels
75.318
kgCO2/year avoided
Hospital – Teruel (Spain)
Hospital
Teruel, España
2025
Installer
Eiffage
Engineering
Ingeniería Torne
159
panels
128
kgCO2/year avoided
OECD Building – Paris (France)
Public center
Paris (France)
2021
Installer
Climasphere
Engineering
-
140
panels
52.955
kgCO2/year avoided
Hotel Iberostar Royal Andalus – Chiclana de la Frontera (Spain)
Hotel
Chiclana de la Frontera (Spain)
2020
Installer
Arki
Engineering
-
300
panels
204.785
kgCO2/year avoided
Hotel Iberostar Las Dalias – Tenerife (Spain)
Hotel
Tenerife (Spain)
2021
Installer
Grupo DAC
Engineering
-
240
panels
256.542
kgCO2/year avoided
Swimming Club – Barcelona (Spain)
Sport Center
Barcelona (Spain)
2023
Installer
Grupo Construcía
Engineering
Grupo Construcía
1041
panels
774.809
kgCO2/year avoided

Decarbonizing your building efficiently and cost-effectively, it has never been easier