Facilities in the Sanitary Sector

Why install the abora Hybrid in your building

Energy fiability

Energy fiability

For an hospital, it is essential to have a reliable energy supply to grant the continuous operation of the life medical teams.

Resilience to the catastrophes

Resilience to the catastrophes

In case of natural catastrophe or emergency, as a breakdown caused by a storm, the solar hybrid panels can get an additional and independant source of energy, necessary to maintain the medical operations and the customers attention.

Optimization of space (sanitary)

Optimization of space

If your house have little space on the roof or on the floor, the installation of hybrid panels means un use more efficient of this space, if we compare them with the photovoltaic and thermal systems, because the solar hybris panel produce more energy per m2.

Positive institutional image

Positive institutional image

The installation of solar hybrid panels can improve the hospital image as an engaged institution with the sustainable development. This can be apreciated by patients, staff and the local community.

Reduction of our carbon footprint

Reduction of our carbon footprint

Choosing a renewable and clean source of energy, the hospital can reduce its carbono footprint and its emissions of greenhouse gases. This helps to the environmental sustainability and to fight against the climate change.

Funding options

Funding options

Consult the different funding options.

The panel made in Spain

The panel made in Spain

We make our panel totally at our factory in Zaragoza

Solution two by one

Solution two by one

The hybrid solar panel allows to produce electricity and sanitary hot water at the same time. Thanks to his efficiency, you can take advantage of solar radiation. Its hybris technologie allows to get the quadruple of energy that the photovoltaic panel in a minimum space.

More savings

More savings

With the hybrid, the hotels can produce a part of their needs of electricity and heat, reducing their dependence on the network and reaching a saving in their energy bills, in addition, they protect them of the increase of the energy costs and they give you some long-term financial benefits.

Imagen del catálogo

Download the catalog of this sector

Discover our installations

Showing: 12 installations
Clear filter
Torre Monreal Residence – Tudela (Spain)
Nursing home
Tudela (Spain)
2022
Installer
Gamio Denalan Obras y Servicios SL.
Engineering
-
100
panels
67.145
kgCO2/year avoided
Casetas Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ambitec S.A.U.
Engineering
-
50
panels
35.071
kgCO2/year avoided
Vitalia Residence – Madrid (Spain)
Nursing home
Madrid (Spain)
2019
Installer
-
Engineering
-
23
panels
17.922
kgCO2/year avoided
Vitalia Residence – Málaga (Spain)
Nursing home
Málaga (Spain)
2018
Installer
-
Engineering
-
64
panels
33.920
kgCO2/year avoided
Vitalia Residence – Toledo (Spain)
Nursing home
Toledo (Spain)
2018
Installer
FLUHIDRA INSTALACIONES
Engineering
-
64
panels
33.920
kgCO2/year avoided
Vitalia Residence – Torrejón de Ardoz (Spain)
Nursing home
Torrejón de Ardoz (Spain)
2019
Installer
Grupo Intra s.a
Engineering
-
78
panels
37.242
kgCO2/year avoided
Vitalia Residence – Zaragoza (Spain)
Nursing home
Zaragoza (Spain)
2019
Installer
Ecoclima
Engineering
-
64
panels
33.920
kgCO2/year avoided
Residence – Rosales del Canal (Spain)
Nursing home
Rosales del Canal (Spain)
2019
Installer
Tecmosa
Engineering
-
63
panels
44.716
kgCO2/year avoided
Campotejar Residence – Granada (Spain)
Nursing home
Granada (Spain)
2019
Installer
Ingener del Sur S.L.
Engineering
-
51
panels
27.030
kgCO2/year avoided
Solera Asistencial Residence – Pamplona (Spain)
Nursing home
Pamplona (Spain)
2022
Installer
GAMIO DENALAN OBRAS Y SERVICIOS SL.
Engineering
-
136
panels
92.365
kgCO2/year avoided
CIBA Biomedical Research Center of Aragón – Zaragoza (Spain)
Hospital
Zaragoza (Spain)
2023
Installer
Grupo Cobra
Engineering
-
58
panels
83.020
kgCO2/year avoided
Maz – Zaragoza (Spain)
Hospital
Zaragoza (Spain)
2023
Installer
Veolia
Engineering
-
90
panels
66.684
kgCO2/year avoided

They already trust us

Testimonials

My Hybrid Project

Use our simulator to see your hybrid solar installation and learn about all its advantages.

Monitor

Discover our monitoring system, aHMonitor and everything it offers.

abora experience Do more with hybrid solar panels

Don’t loose your time and your money, bet on us!