Facilities in the Sanitary Sector
Why install the abora Hybrid in your building
Energy fiability
For an hospital, it is essential to have a reliable energy supply to grant the continuous operation of the life medical teams.
Resilience to the catastrophes
In case of natural catastrophe or emergency, as a breakdown caused by a storm, the solar hybrid panels can get an additional and independant source of energy, necessary to maintain the medical operations and the customers attention.
Optimization of space
If your house have little space on the roof or on the floor, the installation of hybrid panels means un use more efficient of this space, if we compare them with the photovoltaic and thermal systems, because the solar hybris panel produce more energy per m2.
Positive institutional image
The installation of solar hybrid panels can improve the hospital image as an engaged institution with the sustainable development. This can be apreciated by patients, staff and the local community.
Reduction of our carbon footprint
Choosing a renewable and clean source of energy, the hospital can reduce its carbono footprint and its emissions of greenhouse gases. This helps to the environmental sustainability and to fight against the climate change.
Funding options
Consult the different funding options.
The panel made in Spain
We make our panel totally at our factory in Zaragoza
Solution two by one
The hybrid solar panel allows to produce electricity and sanitary hot water at the same time. Thanks to his efficiency, you can take advantage of solar radiation. Its hybris technologie allows to get the quadruple of energy that the photovoltaic panel in a minimum space.
More savings
With the hybrid, the hotels can produce a part of their needs of electricity and heat, reducing their dependence on the network and reaching a saving in their energy bills, in addition, they protect them of the increase of the energy costs and they give you some long-term financial benefits.
Download the catalog of this sector
Discover our installations
panels
kgCO2/year avoided
panels
kgCO2/year avoided
panels
kgCO2/year avoided
panels
kgCO2/year avoided
panels
kgCO2/year avoided
panels
kgCO2/year avoided
panels
kgCO2/year avoided
panels
kgCO2/year avoided
panels
kgCO2/year avoided
panels
kgCO2/year avoided